Menu
Visitors` Statistics
 Visitors of page : 926
 Visitors of day : 3
 Visitors sum : 1144
 Online visitors : 1
 Page load : 0.2813
Abadan Refinery Development Refinery
Title:

 

Abadan Refinery Development

 

Goals:

  • Stabilize current production capacity by construction of a new Train and modify the process in order to meet the Environmental Protection Obligations 
  •  Construct a new train with 210,000 BPSD capacity
  • Optimize the production of Gas Oil and middle distillate products
  •  Upgrade products specifications according to meet Euro-V Standards  

 

Investment:

2 B €

 

Contractors:

 

Aria Petro Gas for Tanking

 

Consultans:

 

Namvaran 

 

Licensors:

Axens - Technip KTI- Topsoe

Latest Status:

 

 

Basic Design has been completed.

 

 

 

No. New Units Cap. BPSD Licenser
1 CDU/VDU

210,000 (one unit)

Namvaran

2 CCR

55000 (one unit)

AXENS
3 NHDS

74600 (one unit)

AXENS
4

Isomerization

20000 (one unit)

AXENS
5

LPG Recovery 1 st

7500 (one unit)

Namvaran
6 LPG Recovery 2 st

6754 (one unit)

Namvaran
7 HC

42000 (one unit)

AXENS
8 Kero.HDS

40470 (one unit)

AXENS
9 Diesel..HDS

84700 (two  unit)

AXENS
10 HVGO

40600 (one unit)

AXENS
11 Hydrogen

112.5  MMSCFD (one unit)

AXENS
12 Amine treating

27000 (one unit)

Namvaran
13 1 st SWS

157300 (one unit)

Namvaran
14  2 stSWS

40000 (one unit)

Namvaran
15

SRU+SSU+TGT

460 (TPD)

KTI

  
     

No. PRODUCT Existing Cap. BPSD New Cap BSPD
1

Gasoline

54000

103200 

2

Super Gasoline

- 23180
3

Gas Oil

111800

110510

4

Jet/Kerosene

25000

50760
5

Fuel Oil

153000

88800

6

LPG

9300

9420

7

Sulfur

100 TPD

560

8

Naphtha

16000 16000
9

Feed

16000 16000
10

Oil Feed

2000 2000